Concrete Swimming Pool Construction process
pRIOR TO CONSTRUCTION
Once you contact Empire Pools, our designer or the builder will meet you onsite to discuss your pool ideas and layout. This meeting is essential — it allows us to inspect access, take measurements, and understand the machinery needed for excavation.
We assess the ground conditions, soil type, existing retaining walls, nearby structures, and fences. These details help us recommend the best and safest position for your new pool, potentially saving you money and future issues.
We’ll also check for easements, stormwater or sewer lines, inspection pits, and service locations like Telstra boxes or mains power cables. These can impact where your pool can legally and safely go, especially in front yards.
After this, we’ll prepare a custom pool design and a detailed quote. Once you’re happy with everything, we’ll send you an online contract via Edocs. Once signed, your deposit invoice will be sent, and the next phase begins.
BUILDING YOUR CONCRETE SWIMMING POOL
We submit your design to our engineer, who prepares your official plans. Once completed, we forward them to our private certifier. After approval, our builder or pool supervisor will contact you to book a start date and walk through what’s next.
EXCAVATION
Excavation is an exciting stage — especially for the kids! It’s the first time you’ll see the shape of your new swimming pool carved out in your backyard.
It might look easy, but this step takes experience and precision. As soon as excavation is complete, we move straight into the steel frame.
BOX AND STEEL FORMWORK
Steel formwork usually takes 1–2 days depending on pool size. Our team bends and fixes steel reinforcement to match your pool’s shape, ensuring strength and durability.
Your Pool construction is taking shape !
INTERNAL POOL PLUMBING
The pool plumbing is what maintains the circulation system. Installing all the pipework into the structure as well as the skimmer & mandarin. All flowing systems that are requested according to your design will be installed at this time, such as therapy jets, deck jets, water features and any heating provision pipes & suctions.This process can take anywhere from 3 hrs to 2 days depending on the complexity of your chosen inclusions
CONCRETE SHELL FORMATION
The next three days of the pool construction process, is the pressurized concrete that is placed and sculpted according to your individual design. Our craftsman are skill in handling the heavy equipment that it takes to gather the concrete and then shape your pool, spa, and even the steps to your pool.
POOL TILING & COPING
Coping tiles usually take 1–2 days to lay. Interior tiling may take anywhere from 2 days to 2 weeks depending on the design and finish you’ve chosen.
POOL FILTRATION INSTALLATION
Our licensed Pool plumber will complete the installation of your filtration. Everything will be set in place and PURAPOOL the sanitiser will be mounted on the wall
PEBBLE INTERIOR
Once your pool fencing requirements are completed and approved by the certifier, the pool interior will be completed. Our Pebble crete interiors are usually acid washed in the afternoons however if your pool is completed late afternoon it will be acid washed the next morning. You will need to leave a hose on site as once the pebble crete is acid washed they will put your hose in the pool and the pool will start filling.
POOL HANDOVER & COMPLETION
At handover, our technician walks you through every element of your pool system. They’ll explain how to operate it, how to clean and maintain it, and answer any questions.
Our team ensures your pool is fully functional — and ready to enjoy.